Event detail icon
Comment Period

Boeing Everett Public Comment Period

Draft Documents Available for Review and Comment

Feb. 15, 2021 - April 19, 2021, 11:55 p.m.

We invite you to review and comment on draft documents for Boeing Everett in Everett, Washington.

The Boeing Company owns and operates the Boeing Everett plant, which makes commercial aircraft.  Dangerous wastes are generated during aircraft assembly, and accumulate on site for less than 90 days.

Draft documents for review

The following documents are available for review and comment: 

Purpose and background of these documents

  • Draft Remedial Investigation (RI): The RI studies the site conditions and contamination so the FS and SFS can compare cleanup actions.
  • Feasibility Study (FS), and Supplemental Feasibility Study (SFS): The FS and SFS compare cleanup methods for the site. The SFS was modified by four letters: Aug. 2016July 2017May 2019Sept 2019
  • Draft Cleanup Action Plan (dCAP): We prepared this dCAP that describes the cleanup actions and sets the cleanup standards. 
  • Enforcement Order: Boeing asked us to use an Enforcement Order to implement the Cleanup Action Plan.
  • Draft Agreed Order (AO): Boeing and Ecology decided to use an Agreed Order to implement the Cleanup Action Plan for the portion of the site called the Bomarc property so it can be sold. 
  • Draft Permit Lite: A Permit Lite is a “Dangerous Waste Corrective Action Permit,” that allows environmental cleanup at the site to continue. 
  • Draft State Environmental Policy Act (SEPA) Checklist: We use SEPA during site cleanups to find and evaluate large, negative environmental impacts that could result from a proposed action. Our evaluation of this SEPA checklist resulted in an Associated Determination of Non-Significance.
  • Draft Public Participation Plan (PPP): The PPP encourages comment and involvement in cleanup decisions from the community.

What happens when the public comment period ends?

When the public comment period ends, we consider all public comments and may change the documents based on them. After considering all public comments, the documents will become final.

Public meetings

At this time, there are no public meetings scheduled for this comment period. To request a virtual public meeting, please call 425-301-6454 or email janelle.anderson@ecy.wa.gov.

Comment online icon

Comment online

Comment by mail icon

Comment by mail

Paul Bianco
3190 160th Avenue SE
Bellevue, WA 98008-5452
Questions icon

Questions

Janelle Anderson
Community Outreach Specialist
janelle.anderson@ecy.wa.gov
(425) 649-7286

To request ADA accommodation, contact Ecology's ADA Coordinator by email at ecyadacoordinator@ecy.wa.gov, or call 360-407-6831, 711 (relay service), or 877-833-6341 (TTY). More about our accessibility services.