Please review and comment on the draft environmental review addressing the proposed flood reduction project for the Chehalis River basin.
Background
We have prepared this draft state Environmental Impact Statement (EIS) under the State Environmental Policy Act. The EIS assesses a project proposed by the Chehalis River Basin Flood Control Zone District to build and operate a flood retention dam and associated temporary reservoir on the Chehalis River south of Pe Ell, Washington. The proposal also covers improvements to the Chehalis-Centralia Airport levee to reduce flood damage.