Event detail icon
Comment Period

Kalama Manufacturing and Marine Export Facility

Draft Second Supplemental Environmental Impact Statement (EIS)

Sept. 2, 2020 - Oct. 2, 2020, 11:59 p.m.

Information on an online public hearing for the draft Second Supplemental Environmental Impact Statement (EIS) for the proposed Kalama Manufacturing and Marine Export Facility.

Para obtener más información, llame a Meg Bommarito al 425-649-7128 y solicite un intérprete.

We want your comments on the draft Second Supplemental Environmental Impact Statement (EIS) for the proposed Kalama Manufacturing and Marine Export Facility. The document fully analyzes greenhouse gas emissions from the proposed Kalama methanol facility.

This analysis looks at impacts from sources of emissions, such as:

  • Greenhouse gases that escape from natural gas wells and pipelines.
  • Direct and indirect emissions produced at the facility.
  • Downstream emissions from transporting methanol to Asia.
  • How the product will be used.

Background

Northwest Innovation Works and the Port of Kalama have applied to build the Kalama Manufacturing and Marine Export Facility, a facility in Kalama that would turn natural gas into methanol. The facility would be able to produce 10,000 metric tons of methanol a day and would use 320 million cubic feet of natural gas a day.

Comment online icon

Comment online

Comment by mail icon

Comment by mail

Rich Doenges re: NWIW SSEIS
Washington Department of Ecology
Southwest Regional Office
P.O. Box 47775
Olympia, WA 98504-7775
Related event icon

Attend a related event

Questions icon

Questions

Jeff Zenk
Southwest Region Communications Manager
jeff.zenk@ecy.wa.gov
360-407-6239

To request ADA accommodation, contact Ecology's ADA Coordinator by email at ecyadacoordinator@ecy.wa.gov, or call 360-407-6831, 711 (relay service), or 877-833-6341 (TTY). More about our accessibility services.