VoltaGrid Electric Generation Plant, Quincy
Air quality notice of construction application WITHDRAWN
July 7, 2026, 12 a.m. - Aug. 13, 2026, 11:59 p.m. PT
July 23, 2026 – The public comment period and public hearing are cancelled. VoltaGrid has withdrawn their application, so we will not be issuing a permit. We will not be responding to comments.
July 7, 2026 – We propose to approve VoltaGrid Electric Generation Plant's air quality notice of construction (NOC) application.
VoltaGrid submitted a notice of construction application for their site located east of Road O NW and north of Road L NW, in Quincy (Parcel 0401414050 at Section 4, Township 20 N, Range 24 E). VoltaGrid supplies affordable, ready-to-use clean power and fuel solutions for both remote locations and sites connected to the electricity grid.
VoltaGrid is proposing to install 14 prime power natural gas generators, 30 megawatts (MWe) total power supply. VoltaGrid plans to install air pollution control equipment to the generators. This includes selective catalytic reduction controls for nitrogen oxides, and oxidation catalyst controls for carbon monoxide and volatile organic compounds.
Emission increases from this project include:
- 41 tons per year carbon monoxide (CO)
- 10 tons per year volatile organic compounds (VOCs)
- 8.8 tons per year particulate matter (PM)
- 8.7 tons per year nitrogen oxides (NOx)
- 6.3 tons per year formaldehyde (CH₂O)
- 6.2 tons per year sulfur dioxide (SO₂)
Documents for review
- VoltaGrid notice of construction (NOC) application and supporting documents
- VoltaGrid air quality impact assessment
- VoltaGrid draft permit
- VoltaGrid technical support document
We determined this proposal satisfies the requirements of Chapter 173-400 WAC. We plan to approve the application.
Public hearing CANCELLED
(if requested by July 22, 2026, 11:59 p.m.)
Monday, August 10, 2026, 6 p.m. online
To comment by August 13, 2026, use one of the ways listed below.
To find out if there are more records for this project, contact our Public Records Office.
This notice was posted on July 7, 2026 and updated July 23, 2026.
Background
A notice of construction permit is required before installing a new source of air pollution or modifying an existing source of air pollution. This permit is sometimes called a "pre-construction permit" because a business must have one before starting construction or operating their business.
A notice of construction air permit limits the amount of air pollutants a business can emit.
Comment online
- Use our online comment form
Comment by mail
Washington Department of Ecology Eastern Regional Office
4601 North Monroe Street
Spokane, WA 99205-1265
Questions
To request ADA accommodation, contact Ecology's ADA Coordinator by email at ecyadacoordinator@ecy.wa.gov, or call 360-407-6831, 711 (relay service), or 877-833-6341 (TTY). More about our accessibility services.