LeRoi Co Smelter cleanup site, Northport
Draft periodic review report
Nov. 13, 2023 - Dec. 15, 2023, 11:59 p.m.
We invite you to review and comment on the draft periodic review report, which includes the results of our site condition review to ensure cleanup is still protective.
We visited the site Oct. 27, 2022, and found the cleanup remains effective. The site is vacant.
Learn more
- Review the draft Second Periodic Review.
- Visit our LeRoi Co Smelter cleanup site page.
Next steps
We will review all comments received during the comment period and update the periodic review, if needed. If no significant changes are made, the periodic review will become final. If significant changes are made, we will hold an additional public comment period. We will hold an online public meeting if 10 or more people request one.
Site history and cleanup
The LeRoi Smelter operated intermittently from 1896 to 1909, processing various metals, including lead. In 2004, the U.S. Environmental Protection Agency consolidated all scrap metal for recycling, consolidated and capped contaminated soil with a protective barrier, and properly disposed of hazardous materials off-site. Access controls and an environmental covenant limit public access and protect the integrity of the cleanup actions.
About periodic reviews
Periodic reviews are required when institutional controls are required at a site. Institutional controls can be fences, signs, or restrictions on how the property is used. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Comment online
- Use our online comment form
- Submit your comment by email: sandra.treccani@ecy.wa.gov
Comment by mail
4601 N. Monroe St.
Spokane, WA 99205
Questions
To request ADA accommodation, contact Ecology's ADA Coordinator by email at ecyadacoordinator@ecy.wa.gov, or call 360-407-6831, 711 (relay service), or 877-833-6341 (TTY). More about our accessibility services.