June 12 Director Bellon Letter
This letter to EPA from Director Bellon asking to cease action on Washington's water quality standards.
https://ecology.wa.gov/june-12-director-bellon-letter
Letter to Chairman Barrossa Senate Committee on Environment and Public Works
A letter from the Washington Department of Ecology, signed by Director Maia Bellon, to Senators John Barrsso and Tom Carpenter, Chairman and ranking member of the Senate Environment & Public Works Committee, respectively, setting the record straight on why a water quality certification was denied to Millennium Bilk Terminals - Longview.
https://ecology.wa.gov/letter-to-chairman-barrossa
Letter to Colonel Mark Geraldi, U.S. Army Corps of Engineers
A letter to Colonel Mark Geraldi, U.S. Army Corps of Engineers, from the Washington Department of Ecology, signed by Director Maia Bellon, expressing deep concern over its restarting the federal permitting process for Millennium Bulk Terminals in Longview.
https://ecology.wa.gov/letter-to-colonel-geraldi
Industrial Stormwater Monthly Site Inspection Form
Use this form for your monthly inspections if you are industrial stormwater permit holder. Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact stormwater quality at the facility, and evaluate the effectiveness of best management practices required by this permit. Retain a copy of the completed and signed form.
https://ecology.wa.gov/industrial-stormwater-monthly-site-inspection-form
Water Decontaminator
Ecology finds this water decontaminator is functionally equivalent to the catch basin insert for stormwater control. While this product does not meet Washington's water quality performance criteria, it may be used in retrofit or construction situations to provide some level of TSS removal for stormwater.
https://ecology.wa.gov/invreshpaoluccio
Industrial Stormwater General Permit
We issued the Industrial Stormwater General Permit in 2014. This is a National Pollutant Discharge Elimination System (NPDES) and State Waste Discharge General Permit for stormwater discharges associated with industrial activities.
https://ecology.wa.gov/industrialstormwatergeneralpermit
ISGP Appendix 3
Appendix 3 - SWPPP Certification Form
https://ecology.wa.gov/isgp-appendix-3
CSWGP Site Inspection Form
All Permittees must inspect the construction site and monitor water discharging from the construction site. Inspections must be summarized in an Inspection Report or Checklist and kept with the Site Log Book. These requirements are listed in the CSWGP - S4. Monitoring Requirements, Benchmarks and Reporting Triggers.
https://ecology.wa.gov/inspectionform