Regulations & Permits

Use this portal to filter and search for all of our regulatory information.

Regulations & Permits icon

We oversee many state and federal laws designed to protect Washington's land, air, and water. See our laws, rules, & rulemaking page for more information about our current rules and rulemaking.

See more about this collection...
Refine ResultsClose Filters

Regulations & Permits

Use this portal to filter and search for all of our regulatory information.

Regulations & Permits icon

We oversee many state and federal laws designed to protect Washington's land, air, and water. See our laws, rules, & rulemaking page for more information about our current rules and rulemaking.

See more about this collection...
2015 Fact Sheet for Upland Fin-fish Hatching and Rearing General Permit
This is a fact sheet for the 2015 Upland Fin-fish Hatching and Rearing General Permit. This fact sheet explains the nature of the discharges covered by the general permit, our decisions on limiting the pollutants in the wastewater, and the regulatory and technical bases for those decisions.
https://ecology.wa.gov/factsheetfinal12152015
2016 Fresh Fruit Packing General Permit fact sheet
This is the Fresh Fruit Packing General Permit fact sheet from 2016.
https://ecology.wa.gov/ffpgpfactsheet2016
Ecology Water Quality Funded Activity Projects FFATA Reporting Form
Ecology Water Quality Funded Activity Projects FFATA Reporting Form
https://ecology.wa.gov/ffata-form-for-nonpoint-projects
Bridge and Ferry Terminal Washing General Permit Appendix E: Response to Comments
Bridge and Ferry Terminal Washing General Permit Appendix E: Response to Comments
https://ecology.wa.gov/factsheetappendixe-responsetocomments
2016 Fresh Fruit Packing General Permit
This is the Fresh Fruit Packing General Permit from 2016.
https://ecology.wa.gov/ffpgppermit2016
CAFO fact sheet.
This fact sheet is a companion document to the draft revised Concentrated Animal Feeding Operation General (CAFO) National Pollutant Discharge Elimination System (NPDES) and State Waste Discharge General Permit (combined permit) and the draft CAFO State Waste General Permit (state permit). It provides the legal and technical basis for permit issuance or reissuance required in Washington Administra
https://ecology.wa.gov/fact-sheet-draft
Boatyard general permit FAQs
Answers to frequently asked questions about the Boatyard general permit
https://ecology.wa.gov/faqboatyard
Field Crop Information Template
Template for data required in CAFO Annual Reports
https://ecology.wa.gov/field-crop-information-template
Field Nutrient Budget Template
Template for submitting CAFO annual reports
https://ecology.wa.gov/field-nutrient-budget-template
Ecology Water Quality Funded Facility Projects Federal Funding Accountability and Transparancy Act (FFATA) form
Ecology Water Quality Funded Facility Projects Federal Funding Accountability and Transparancy Act (FFATA) form
https://ecology.wa.gov/ffata-form-for-facility-projects
Field Soil Sample Template
Template for submitting data to CAFO Annual Report
https://ecology.wa.gov/field-soil-sample-template
Ecology Water Quality Funded Facility Projects Opinion of Legal Counsel template
Ecology Water Quality Funded Facility Projects Opinion of Legal Counsel template
https://ecology.wa.gov/opinion-of-legal-counsel
Filtrexx SiltSoxx, InletSoxx, and DitchChexx Functional Equivalency letter
Ecology finds Filtrexx SiltSoxx functionally equivalent to a silt fence, InletSoxx functionally equivalent to storm drain inlet protection options, and DitchChexx functionally equivalent to check dams options for stormwater management.
https://ecology.wa.gov/filtrexx
2014 Modification Statement of Basis
Western Washington Phase II Municipal Stormwater Permit 2014 Modification Statement of Basis
https://ecology.wa.gov/factsheetstatemtbasis
Lower Yakima Valley Groundwater Management Program FAQs - Spanish
Frequently Asked Questions - Spanish
https://ecology.wa.gov/gwma-frequently-asked-questions-spanish
Final Determination Letter to Deny the NPDES permit applicaiton
Letter to WGHOGA stating our final determination to deny the NPDES permit application.
https://ecology.wa.gov/final-determination-letter
Construction Stormwater General Permit Fact Sheet
This is the detailed explanation of the authority and defensibility of the Construction Stormwater General Permit. This fact sheet is a companion document to the draft revised National Pollutant Discharge Elimination System (NPDES) and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activity (Construction Stormwater General Permit).
https://ecology.wa.gov/factsheet2015
Fact Sheet Addendum for the CSWGP Modification
December 21, 2016 Fact Sheet Addendum for the CSWGP Modification
https://ecology.wa.gov/factsheetmod-2016
Fact Sheet for 2016 Phase I Modification
Phase I Municipal Stormwater Permit Fact Sheet for 2016 Modification
https://ecology.wa.gov/factsheet2016phaseipermitmod
1887 results 1261 - 1280 of 1887 Previous page   Next page