Boatyard general permit Erratus
Boatyard general permit Corrections and Clarifications (Erratus)
https://ecology.wa.gov/boatyard-erratumandclarifications-20160927
Boatyard general permit
This permit protects marine waters from toxics that can get into stormwater runoff from boatyards.
https://ecology.wa.gov/boatyard-generalpermit-final-20160706
2011-2016 Boatyard general permit
This is the previous permit that is no longer active. This permit protects marine waters from toxics that can get into stormwater runoff from boatyards.
https://ecology.wa.gov/boatyardpermit030211
Silt Fence BMP
Best managment practice for Silt Fence.
https://ecology.wa.gov/bmpc233siltfencefe
Boatyard permit holders
Current list of boatyard permit holders in Washington
https://ecology.wa.gov/boatyardscoveredbygp-20150608
What changed between permits?
This shows what changed between the 2011-2016 Boatyard general permit and the current version (2016-2021).
https://ecology.wa.gov/boatyard-summaryofchanges-2011to2016
BMP Supplies Spring Berm
This letter determines that the Best Management Practices Supplies Spring Berm is functionally equivalent to the C207 (Check Dam) and C208 (Triangular Silt Dike) Best Management Practices.
https://ecology.wa.gov/bmpsupplies
Bioretention Inspection Form
Low Impact Development guidance - Bioretention Inspection Form
https://ecology.wa.gov/bioretentioninspectionform