Process design
Process design - voluntary clean water guidance for agricultural activities
https://ecology.wa.gov/process-design
PSNGP Annual Report Instructions-Year1
Instructions for Puget Sound Nutrient General Permit holders to submit their Annual Reports for Year 1.
https://ecology.wa.gov/psngpannualreportinstructions-year1
QuincyWWTFtmdl
TMDL Fact Sheet for the Quincy Industrial Waste Treatment Facility
https://ecology.wa.gov/quincy-waste-treatment-facility-tmdl
Recommendation to Deny SIZ application memo
Memo: recommendation to deny Sediment Impact Zone applications as impacts of the discharge prohibit Sediment Impact Zone authorization and cannot be addressed via permit conditions.
https://ecology.wa.gov/recommendation-to-deny-siz-application
Q&A MS4
questions and answers from planning meeting.
https://ecology.wa.gov/q-a
Prelimary Draft Sand and Gravel
Draft language for the for Sand and Gravel Permit. Includees Process Water, Stormwater, and Mine Dewatering Water Discharges Associated with Sand and Gravel Operations, Rock Quarries, and Similar Mining Facilities, Including Stockpiles of Mined Materials, Concrete Batch Operations and Hot Mix Asphalt Operations.
https://ecology.wa.gov/preliminarydraft-1
Concrete Recycling
Explanation of Sand & Gravel General Permit Preliminary Draft Language about Concrete Recycling
https://ecology.wa.gov/rcpreliminarydraftpresentation2015