Refine ResultsClose Filters
Clima Cover
Letter verifying that ClimaCover All Weather Protective Systems can be used as an alternative to sandbags in stormwater control.
https://ecology.wa.gov/climacover
Interceptor ClimaCover
Ecology finds ClimaCover Interceptor Dike is equivalent to BMP C200 Interceptor Dam. The specifications for the check dam system must adhere to the specifications listed in this letter.
https://ecology.wa.gov/climacoverinterceptordikefea
Silva Cell Modeling Procedure
Report on using the Western Washington Hydrology Model (Vers. 4.0) to size Silva Cells for stormwater runoff treatment and flow control.
https://ecology.wa.gov/deeprootssilvacellmodelingprocedure